Industrial Process News

Call 0121 550 2086

Follow us on Twitter (X), LinkedIn &
download our iOS App here and our Android app here

Yearsley Logistics optimises warehouse flow with racking from SSI Schaefer

SSI Schaefer is pleased to announce the delivery of a new pallet storage solution to Yearsley Logistics’ Belle Eau Park Distribution Centre at Newark.

SSISchaefer_650_04The new storage facility, which represents an extension to the existing site, comprises a 15m high building with a 13,400m² footprint creating storage for more than 26,700 pallet positions. It has been designed to accommodate a national foodservice supplier’s ambient distribution operation.

The actual build is larger than current requirements and has options to extend – this presents the group with additional sales potential in a whole new business arena.

SSISchaefer_650_06The operation currently handles 1,200 pallets per day intake and picks 365,000 units per week across a total of 5,500 SKU lines.

Two storage systems will operate, the largest of which consists of approximately 15,000 wide aisle pallet locations in an 8,100m² footprint, offering both full pallet and full case picking options, serviced with reach trucks and low level order pickers. The heavy duty racking manufactured by SSI Schaefer can carry 3 x 1,100 kg pallets per beam level, while galvanised finished frames and painted wire decking panels are ideal for this food environment application. The system achieves a storage density of approximately 0.54m² per pallet stored.

Complementing the wide aisle racking, the second system comprises 11,700 locations in powered mobile racking on a 3,000m² footprint, occupying only 0.25m² per pallet stored, including one aisle in each of 4 blocks. This space-saving mobile racking provides a very dense and efficient storage medium and is designed for storage and picking of full pallets.

SSISchaefer_650_07SSI Schaefer integrated the design and installation of the rails and control systems with Russells Construction, who undertook the building project. The rapid fast-track racking installation commenced in November to meet a mid-January handover date for 7,200 wide aisle pallet positions, although this element of the installation was completed early, by the end of December. The mobile racking and complete system is due for completion at the end of February 2016.

The new development is part of a 3-phase investment that Yearsley Logistics is making on the Belle Eau site, bringing continued employment and growth to this area.

SSI Schaefer was selected after competitive tender due to its advanced technology in mobile system and high quality products.

T 01264 386600
solutions@ssi-schaefer.co.uk
www.ssi-schaefer.co.uk